Spanish Colonial restorations, historic Flats homes, and any project where the architectural integrity of the window line defines the value of the house. Quote in 48 hours.
On a $5M Spanish Colonial in the Flats, replacing the original steel casements with vinyl is a $400K mistake — the resale buyer at that price point will discount heavily for a window line that doesn't match the architecture. Clad-wood, with an aluminum-clad exterior in bronze and a wood interior, is the only material that reads correctly from both inside and out on a 1920s or 1930s Beverly Hills Spanish Colonial. We've replaced original steel casements on six Flats properties and matched the original sightline profile to within 1/16 inch using Marvin Ultimate custom mullion. This work takes longer than a standard vinyl swap — but it's the work the house requires.
Marvin Ultimate or Andersen E-Series in bronze-clad aluminum, exterior. Interior in natural mahogany, white oak, or Douglas fir to match the original or owner's preference. Simulated divided lites on all primary elevations — custom muntin dimensions if the original profiles require it.
Beverly Hills wood window replacements are predominantly in pre-war estate homes on the flats, where original steel casements and wood double-hungs are reaching end of life. The Beverly Hills Building Department requires structural calculations for any opening modification and a separate utility release from landscaping irrigation systems if our equipment crosses the setback zone. We work exclusively with Andersen E-Series and Marvin Ultimate for wood-clad installs here — both have the profile depth and historical authenticity to clear architectural review without a variance.
Beverly Hills Building & Safety, 14–21 days plus 10–14 day historic-resource screening on pre-1965 homes. Wood window replacements on the Flats Spanish Colonials always trigger the screening. Structural calc letter for five or more windows. At 1.30× modifier, clad-wood installs run $2,600–$4,550/window.
Free walkthrough, fixed price in 48 hours. No deposit until materials are on-site.
Get my 48-hour quote