French Door Installation for Santa Monica homes — craftsman, modern coastal. All-in pricing: $3,500–$9,400. Permit pulled, Title 24 filed, lifetime install warranty. Free 48-hour quote.
Santa Monica's craftsman, modern coastal housing stock shapes how we approach every French door installation project here. The all-in pricing band for Santa Monica is $3,500–$9,400 — reflecting the higher-cost (1.18× baseline) labor and logistics costs for this market. French doors bring light and flow between interior spaces and patios, but they require a flat threshold and enough clearance for the swing arc. Santa Monica Building & Safety runs 2–3 weeks. We file the permit and CF1R/CF2R energy documentation as soon as we have the signed contract, so the permit is moving while your materials are being fabricated. This market also involves coastal zone — all handled by Red Stag as part of the project, at no extra charge.
French doors in coastal locations need the full marine-spec hardware package: stainless hinges, stainless deadbolt and handle set, marine-grade threshold seal. Standard brass and nickel hardware tarnishes within 18 months at this proximity to the ocean. Andersen 400 Series or Marvin Signature with stainless hardware is the appropriate spec; Therma-Tru fiberglass with stainless hardware for lower-cost applications.
Coastal zone and seismic zone D. ADU and multifamily stock is common here. Salt-air framing spec on all exterior work. For French door installation projects specifically, Santa Monica homeowners most often ask about coastal zone compliance, scheduling around occupancy, and whether the old unit removal is included. The answer to the last question is always yes — we haul everything away same day. For the all-in pricing band of $3,500–$9,400, you get labor, materials, permit, Title 24 documentation, flashing, interior and exterior finish work, and a lifetime install warranty. Nothing is added later.
Santa Monica Building & Safety, 2–3 weeks. Red Stag pulls the permit, files Title 24 CF1R/CF2R energy documentation, and meets the inspector. Additional items handled: Coastal zone compliance documentation. The permit cost is included in your fixed quote — it is not added later.
Free walkthrough, fixed price in 48 hours. No deposit until materials are on-site.
Get my 48-hour quote