French Door Installation for Beverly Hills homes — spanish colonial, mid-century. All-in pricing: $3,900–$10,400. Permit pulled, Title 24 filed, lifetime install warranty. Free 48-hour quote.
Beverly Hills's spanish colonial, mid-century housing stock shapes how we approach every French door installation project here. The all-in pricing band for Beverly Hills is $3,900–$10,400 — reflecting the premium-tier (1.30× baseline) labor and logistics costs for this market. French doors bring light and flow between interior spaces and patios, but they require a flat threshold and enough clearance for the swing arc. Beverly Hills Community Development runs 3–4 weeks. We file the permit and CF1R/CF2R energy documentation as soon as we have the signed contract, so the permit is moving while your materials are being fabricated. This market also involves HOA covenants — all handled by Red Stag as part of the project, at no extra charge.
French door projects in premium HOA communities are frequently custom configurations: double active panels, divided-lite glass, custom paint, and specific hardware finishes. We present the full specification to the HOA before ordering — color chip, product spec, and elevation drawing — so approval is complete before manufacturing begins. Andersen and Marvin offer the most configuration flexibility; Therma-Tru for projects where cost is sensitive.
Beverly Hills enforces design review on any visible elevation change. HOA covenants cover most streets — we provide the submittal packet. For French door installation projects specifically, Beverly Hills homeowners most often ask about HOA covenants compliance, scheduling around occupancy, and whether the old unit removal is included. The answer to the last question is always yes — we haul everything away same day. For the all-in pricing band of $3,900–$10,400, you get labor, materials, permit, Title 24 documentation, flashing, interior and exterior finish work, and a lifetime install warranty. Nothing is added later.
Beverly Hills Community Development, 3–4 weeks. Red Stag pulls the permit, files Title 24 CF1R/CF2R energy documentation, and meets the inspector. Additional items handled: HOA submittal packet on request. The permit cost is included in your fixed quote — it is not added later.
Free walkthrough, fixed price in 48 hours. No deposit until materials are on-site.
Get my 48-hour quote